January Photos

External Facade.

Facade details.

Boundary fence installation. 

Light filled bedroom

Completed kitchen.

Completed bathroom with 2 PAC joinery. 

Walk-in shower. 

Completed dining room. 

December Photos

External Facade.

Facade details.

Landscaping. 

Finishing touches on the kitchen. 

Kitchen details. 

Finalising courtyard details. 

External ground floor rendering works underway. 

Finalising bathroom details. 

November Photos

External Facade.

Facade details.

Boundary fence installation. 

Finishing touches on the kitchen. 

Almost complete bathroom.

Light filled bedroom

foyer lights

Pendant light installation

Exterior facade.

October Photos

Internal painting.

European Oak flooring installation.

Vanity carcass installation.

Kitchen joinery and flooring installation on level 4. 

Almost complete bathroom.

Built-in robe installed. 

Balcony privacy screen installation. 

Exterior facade.

September Photos

Exterior facade progress.

cornus malvern east II level 4 exterior september update

Facade installation. 

Final coat of paint elev 4 cornus malvern east II

Application of the final coat of paint. 

kitchen installation at cornus malvern east II

Kitchen joinery and flooring installation on level 4. 

Final painting coat on the doors at cornus malvern east ii

Final coat of pain on the doors. 

Bedroom ready for built-robes

Bedroom ready for built-robes.

Balcony privacy screen installation

Balcony privacy screen installation. 

Exterior facade brickwork completion

Close up of the exterior facade brickwork. 

August Photos

malvern east ii august exterior

Exterior facade progress.

malvern east level 4 exterior

Facade installation. 

Interior plaster complete. Painting works commenced. 

Ground floor bathroom waterproofing. 

July Photos

Exterior facade progress. 

Exterior brickwork progress.


External window works completed. 

Exterior ground floor facade preparation and installation.

June Photos

Exterior facade progress.

Level 4 portal wall installation.

External balcony sliding doors and window installation. 


External balcony sliding door installation.


May Photos

Window framing.

Framing and electrical work.

Waste point plumbing.

External frame work.

Early Stage Progress From January Through to April

Roof top concrete pour completion. 

Basement and ramp preparation. 

Precast concrete wall installation. 

Precast concrete wall installation. 

Reinforced steel and post tension system.

Concrete pour in basement.

Formwork preparation for upper basement pour. 

Basement works and concrete preparation.