The team over at our Cornus La Frank site have definitely been eating their Weet-bix as they have progressed tremendously over the past month.
The internal works on the ground floor and level 1 have commenced. As you can see from the photos, the external wall frames and plaster have been installed in addition to the external doors and windows. With this stage now completed on the ground floor and level 1.

The facade is now taking shape with work commencing. Over the past few weeks, there has been much preparation, such as the erection of the scaffolding. The team has now progressed to the sheeting installation and application of the base coat of the render on the ground level.
As we completed the roof terrace pour today, the scaffolding will likely be completed by the end of the month, allowing for more exterior works to be completed.

It’s a very exciting time at our Cornus La Frank project. If you’re interested in purchasing a new apartment, in the heart of Burwood, fill in the form below and our sales team will be in touch. As construction is still underway you can still capitilise on the off-the-plan stamp duty incentives available.